A new town water supply
The main water intake for Adaminaby's water supply was drilled 612m directly to the floor of Lake Eucumbene. Vertical shafts intersecting this bore house dual pumps.
To accurately align the bores, Lucas used TruTrack and magnetic guidance for the horizontal and MacTrac and MGT for the vertical bore alignment.