This high pressure pipeline carries gas from Berri, South Australia to Mildura in Victoria. An EPC project, Lucas was responsible for engineering, procurement of everything except the pipe itself, quality control and inspection. Strong relationships and rigorous project management were the key to making this work. We engaged AGL Construction to work with us on the detailed engineering design. A division of Boral was brought on board to design and construct the above-ground installations, while our own crews were responsible for the pipeline itself and directional-drilled river crossings. With two states involved, regulatory requirements were more challenging than usual.