Project Type: Horizontal Directional Drilling
Client: Chevron Australia Pty Ltd
Value: AU$100 Million
Status: In progress
Lucas provided directional drilling of nine 450 metre long HDD holes, including the stringing, welding and NDT testing of the pipelines. Off shore diving vessels were used to guide 400m of pipeline beyond the exit of each HDD hole to the target lay down area.
Works included establishing a site on Barrow Island, a Class A nature reserve which requires strict environmental management practices for both operations and mobilisation of personnel and equipment to site.