Project Name
Pre-drainage of longwall blocks
Location
Oaky Creek Mine
Type
Surface to In Seam (SIS)
Meters Drilled
6,309
Duration
4.5 months
• The mine required access to a target seam via a new box cut, targeting unmined coal.
• Piezometer data showed hydrostatic pressure (~2300 kPa) and gas content up to 12 m³/t (methane) at shallow depths.
• High pressure and gas content created safety risks, potentially creating an unsafe explosive loading and mining environment.
• SIS drill pad was set outside the mining area at elevation for safety and access.
• Three build sections (~1500m each, 45° entry) were drilled from the pad, each branching into two ~500m laterals, providing six lateral wells through the target area.
• Total meters drilled: 6,309m.
• Drilling completed in 4.5 months (18.7 m/hr average drilling rate).
• Lucas Drilling provided full in-house support: well planning, drilling engineering, geosteering, steering, and project management.
• The proposed design of three wells each with a lateral pump provided drainage redundancy to ensure success.
• Detailed engineering (post tender) reduce project duration by 45% and locked in significant project savings.
• Hard, non-porous tuffs and high methane caused major fluid losses and required a switch to foam drilling.
• Rig operated from an 80m x 40m pit bench.
• Pressurised seam below the water table required balanced, then underbalanced, drilling.
• Water delivery challenges impacted progress.
• Frequent use of lost circulation material (LCM) and aerated fluids was needed.
• SIS well design and underbalanced drilling enabled safe completion of the laterals.
• A robust risk assessment process and real-time rig monitoring provide excellent guidance for decision making.
• Lucas Drilling’s integrated project delivery and collaboration with the client, client consultant and site teams ensured success.
• Frequent budget review and cost tracking ensured the project budget was not exceeded
• Adaptability and resilience overcame geological and operational challenges
Our project history proves that we thrive where standard drilling practices fail.
Whether you are planning a high-complexity directional drilling programme or a critical asset-servicing campaign, Lucas has the technical fleet and the engineering insight to deliver.
Let's discuss how we can de-risk your upcoming scope of work.